What the numbers look like
These figures come from the Kathmandu Post report of 12 July 2026. They are one builder's and one agency's numbers, not a price list.
- Daily wages: about Rs 1,200 for unskilled and Rs 2,000 for skilled labour (the same builder).
- Bricks: Rs 13 per brick off-season to Rs 15 at the peak (Federation of Nepal Brick Industries).
- Year-on-year price change: bricks +13.41%, cement +1.30%, sand +1.02% (National Statistics Office).
Why there is no single rate
Cost varies by location and design, and material and labour prices move through the year. A rate quoted for another house or another district can mislead, so treat any single per-square-foot figure with care.
How to estimate your own house
Work from quantities, not from a rate per square foot:
- Estimate the quantities: cement, rod (steel), bricks, sand, aggregate and labour days.
- Multiply each quantity by your district's rate.
- Add the lines up and compare the total with builders' quotes.
Use the district rate files in Downloads for rates, the Materials & Market news section for recent price moves, and the steel and concrete tools for quantities.