How the method is chosen
Every row of the screener is one sub-category with one amount range, written in lakh (1 crore = 100 lakh). Pick the type of procurement, then the sub-category if one applies, and enter the approved cost estimate. The first row whose range holds the amount is used; a range includes its upper limit and leaves out its lower limit, so Rs 20 lakh falls in the 15–20 lakh row.
If the sub-category you chose has no row for the amount, the screener falls back to the general row of that type.
What you see for a method
For the method it finds, the screener lists the notice period, bid security, bid validity period and performance security with the provision each one comes from, then the sections of the Public Procurement Act, 2063, the rules of the Public Procurement Rules, 2064 and, for Catalog Shopping, the Catalog Shopping Procedure, 2074.
The table of methods and limits highlights the row for your amount, and a checklist lists the points to consider before you start.
Who approves
The approval table shows the level that approves the master plan, the cost estimate and the bid (the proposal for consultancy) at your amount. Each column has its own limits, so the same amount can need a different level for the estimate than for the bid. The levels run from the Section Officer up to the Secretary.