Rate breakdown (Building & Heritage)

Search the Building and Heritage rate analyses by item number or description, open any item to see the labour, materials and equipment behind its rate with the 15% contractor overhead, then tick the items you need, enter quantities and get one combined breakdown you can copy, download as Excel or print.

Rates follow the district rate analysis norms (Building and Heritage) with a 15% contractor overhead. Prices change through the year and differ by district: check the current district rates before you tender.

Guide

What a rate analysis is

Every unit rate in a Nepali estimate is built from quantities of labour, materials and equipment needed for a set basis, such as 10 m³ of brickwork or 100 m² of plaster. Each resource quantity is multiplied by its district rate, the lines are added to a sub-total, and a 15% contractor overhead is added on top. Dividing that total by the basis quantity gives the rate per unit that appears in the Bill of Quantities.

This tool holds 392 Building items and 154 Heritage (traditional construction) items. Open an item to see every line of its analysis; Heritage items also show the rate in the traditional unit where one is given.

Combining items for an estimate

Tick the items you need and enter the quantity for each in its own unit. The tool scales every analysis by quantity ÷ basis, adds up the same resource (same name, unit and rate) across all items, and lists lump sums and percentage allowances separately. The result is one list of total labour and materials with a sub-total, the overhead and a grand total.

You can change the rate of any resource line or the rate and quantity of any selected item; edited fields are highlighted, and Reset rates restores the published figures. Copy puts the tables on the clipboard as text and as a table, Excel downloads them, and Print prints only the breakdown.

Limits

The rates come from the district rate analysis norms and are a starting point, not a quotation. Material and labour prices change through the year and differ by district, so check the current district rates before you tender or sign a contract.

Frequently asked questions

Why does the rate per unit differ from the total of the analysis?

Most analyses are worked out for a basis quantity such as 10 m³ or 100 m². The total is for that basis; the rate per unit is the total divided by the basis quantity.

What does the 15% overhead cover?

The contractor's overhead and profit allowed in the district rate analysis. It is added to the sub-total of labour, materials and equipment.

Why do some resources show -I and -II after the name?

The same resource appears with more than one rate in the source workbook, for example two grades of sand. The suffix tells the lines apart in the combined breakdown.

Can I enter quantities in Nepali numerals?

Yes. Quantity and rate fields accept Devanagari digits as well as 0 to 9.